Skip to content

Trinone Group · Belgrade, Republic of Serbia

Combining the best.

Trinone connects specialized organizations and technologies, coordinating their work around the customer’s project requirements.

  • 4group members
  • 9project stages
  • 17documents in the archive
  • Trinone Group Lead integrator
  • GasTeh Gas equipment
  • KB Armatura Process equipment
  • Institut Mihajlo Pupin Automation and testing
The customer’s task
  • One contract
  • One schedule
  • Documentation in one package
  • One point of responsibility

How we work

One system. Multiple engineering competencies.

Within the TRINONE project framework, the work of legally independent participants is coordinated as one process — from requirements and engineering design to documentation, supply and commissioning of the solution.

International industrial and petrochemical projects

  • ONE PROJECT FRAMEWORK

    A single point of coordination between the participating organizations.

  • ENGINEERING COORDINATION

    Requirements and technical solutions are kept in step.

  • DOCUMENTATION

    Design, technical and accompanying documentation in one workflow.

  • EXECUTION CONTROL

    Completeness, compliance with requirements and project risks are controlled within an agreed process.

Project lifecycle

Project stages

  1. Project development
  2. Engineering
  3. Certification
  4. Tender / proposal
  5. Manufacturing & supply
  6. Site control
  7. Installation
  8. Commissioning
  9. Warranty & service

Lead integrator

Trinone Group in a project

Trinone Group DOO was set up as a project company. Its task is to unify communication between the specialists of the group’s members and to coordinate their actions in solving the customer’s task.

Trinone specialists carry a project from the first requirements to warranty and service: they gather the input data, bring the solutions of the manufacturers and developers together in one technical proposal, prepare the documentation and control completeness, compliance with the requirements and project risks. For the customer this means one contract, one schedule and one point of responsibility.

What Trinone Group takes on

  • Required documentation
  • Technical proposals
  • Expert consultation
  • Presentations and technical descriptions
  • Execution of own contractual obligations
  • Standards and client-specification compliance
  • Project-risk notification

Group of companies

Members of the group

The members of the group are legally independent organizations. Manufacturing, laboratories and development stay with those responsible for them; Trinone Group coordinates their joint work in a project.

  • Lead integrator

    Trinone Group

    Coordination of requirements, documentation and participant interaction within the project framework.

    • Belgrade · Republic of Serbia
    Contact
  • Manufacturer · gas equipment

    GasTeh

    Industrial gas equipment and gas pressure regulation solutions.

    • Full cycle: manufacturing, laboratory, service
    • Nine equipment groups · G100⁠–⁠G900
    Gas equipment catalog
  • Manufacturer · process equipment

    KB Armatura

    Industrial valves and pumps for neutral and aggressive liquids and gases.

    • Belgrade · since 1991
    • CNC and universal machine tools
    Process equipment
  • Systems developer · automation and testing

    Institut Mihajlo Pupin

    Research and engineering: process control, DCS/SCADA, system design and integration.

    • Belgrade · since 1946
    • 497 staff · five ISO certificates
    The institute’s systems