Institut Mihajlo Pupin · turbine governing and protection
ARS-TSControl · TCimp steam turbine governing and protection
ARS-TSControlTCimpAtlas-BPCSIL3API-670
A steam turbine governing and protection system on Atlas Max-RTL® controllers with direct pulse outputs to the control valves. The TCimp electro-hydraulic block trips the turbine on the “2 out of 3” principle and is certified for SIL3.
- SIL3TCimp · IEC 61508, DEKRA certificate, 2022
- 10ms — the governor’s critical function cycle
- 348.5MW — the largest turbine in the references
- 24h — automatic test of the protection channels
How it works · ARS-TSControl · TCimp
Speed, valves, “2 out of 3” protection.
-
Multi-channel measurement: inductive probes read the gear on the rotor and give pulse trains.
-
Speed, power and live-steam pressure governors, limiters, rotor thermal stress calculation. Logic in 30 ms, critical functions in 10 ms.
-
New start-up and shut-down sequences; the turbine auxiliaries by functional groups.
-
Three protection channels drive the three solenoid valves of TCimp. Two active — the oil supply is cut and the hydraulic drives close the valves. One — an alarm only; the turbine keeps running.
-
Every 24 hours the channels are tested one at a time without affecting the other two, as API-670 requires.
System components
- ARS-TSControl
Turbine governors and limiters on Atlas Max-RTL®, two-level redundancy, a function block library.
- TCimp
The “2 out of 3” block: 0.05–0.1 s response, up to 720 l/min, IP65, ATEX on request; API-670, API-612, API-611.
- Atlas-BPC
Turbine speed monitoring modules.
- Overspeed protection
Independent electronic protection — Atlas-NBZ or JAQUET FT300, per project.
- Turbine simulator
A software version for developing the algorithms and a hardware one for testing the cabinet.
- IMP-PHA
A mobile hydraulic unit for testing governor hydraulics in the factory and on site.
Protocols and standards
- SIL3 · IEC 61508
- API-670
- API-612
- API-611
- “2 out of 3” — protection
- “2 out of 2” — governing
- ENTSO-E P1
Where it is used
- TPP and CHP steam turbinesCondensing and district-heating, 65–348.5 MW.
- Industrial turbinesCompressor drives, 11.9–16 MW.
- Rotating machine protectionTCimp — for steam, hydro and gas turbines and in the process industry.
Institut Mihajlo Pupin
The institute’s experience
- 2023CHP Novi Sad, TA1A 135 MW district-heating turbine (165 MW max)
- 2019MSK KikindaAn 11.9 MW back-pressure turbine — air compressor drive
- 2016MSK KikindaA 16 MW condensing turbine
- 2016CHP Novi Sad, TA2A 110 MW district-heating turbine
- 2015TPP Kostolac B1A 348.5 MW condensing turbine
- 2011TPP Kostolac B2A 348.5 MW condensing turbine
- 2011TPP Kolubara A3A 65 MW condensing turbine
- 2010–2011TPP Nikola Tesla A1 and A2210 MW K-200 turbines; the response meets ENTSO-E P1 (2012 test)
Solution selection
Inquiry: ARS-TSControl · TCimp
Describe the site and the task. Trinone Group selects a solution on the institute’s systems together with the group members’ equipment and prepares the proposal and the documentation.
- The site and the task
- System and equipment scope
- Proposal and documentation
QuestionnaireFill in onlineFill in by hand