Above-ground hydrant
- Outlets
- 2 × DN80 + 1 × DN100
- Protection
- breakaway flange pair
- Drain
- automatic, frost protection
Trinone Safe-Tank Resilient System
for petrochemical storage tank farms
The complex includes nitrogen blanketing and emergency nitrogen inerting systems with simultaneous generation and delivery of 3% heavy air-mechanical foam to the fire zone. Simultaneous water cooling of adjacent tanks and a set of measures provided by the complex prevent the incident from developing into a cascade. Protected system components and a foam generation unit located outside the tank farm ensure the survivability of the equipment under various scenarios.
Subsystem 3 · operating principle · five stages
Single contract · coordinated by Trinone Group
Five operating stages of the KB Foam Generation & Delivery System: standby, fire source detection, activation of the installation, foam supply and cooling, elimination of consequences. The points on the diagram open the subsystem equipment with the manufacturer’s specifications.
System in standby mode
Minimal power consumption in automatic standby mode. The system can be started manually.
Fire source detection
Thermal elements and sensors, including optical monitoring. The fire alarm signal is transmitted to the automated control center.
Activation of the installation
On a signal from the controller, foam concentrate and water are supplied to the mixer; the foam and water flow is distributed in the specified directions.
Foam supply and cooling
Heavy foam is supplied to the fire source while a water curtain is simultaneously created on adjacent tanks and installations.
Elimination of consequences
Minimal damage to objects and products covered with foam. Ease of equipment cleaning.

Above-ground hydrant
DN100 PN16 · KB Armatura

Solenoid diaphragm valve
EMMV-P · DN 40–150 PN16 · KB Armatura

Foam chamber
PS-4 600 · L4 / L8 / L12-16 · KB Armatura

Foam deflector
PS 4-700 · SK 4 / 8 / 12 · KB Armatura

Heavy foam generator
PS 4-500 · MS 4–16 · KB Armatura

Tank roof sprinkler
PS 4-400 · KB Armatura

Water curtain nozzle
PS 4-300 · G½″ · KB Armatura

Water spray nozzle
SMV 26 · Ød 7–11 · KB Armatura
Minimal power consumption in automatic standby mode. The system can be started manually.
Thermal elements and sensors, including optical monitoring. The fire alarm signal is transmitted to the automated control center.
On a signal from the controller, foam concentrate and water are supplied to the mixer; the foam and water flow is distributed in the specified directions.
Heavy foam is supplied to the fire source while a water curtain is simultaneously created on adjacent tanks and installations.
Minimal damage to objects and products covered with foam. Ease of equipment cleaning.
Stages and design figures are taken from the system presentation. The points on the diagram are subsystem 3 equipment with the manufacturer’s specifications.
The Trinone Safe-Tank Resilient System complex: a single contract, coordination of the participants and documentation.
Automated control center: controllers, SCADA and supervisory control of the system.
Equipment for the fire suppression subsystem: hydrants, foam chambers, foam generators, sprinklers, curtain nozzles, EMMV valves.
Subsystem 3 · KB Foam Generation & Delivery System
A modular unit with a high degree of factory readiness: the main foam concentrate supply system and a start-up and backup system in case of external power supply failure. Subsystem equipment: the heavy foam delivery chain is the foam chamber, deflector and foam generator; cooling is provided by roof sprinklers and the water curtain; start-up automation by solenoid valves; water supply by hydrants. Specifications are the manufacturer’s data.








On site






Application rates: at least 0.6 l/min per m² of roof and 1.2 l/min per m² of shell; 3% foam, expansion ratio 6.5–8, pressure upstream of the generator from 5 bar. Calculation for your tank farm →