Institut Mihajlo Pupin · controllers and RTUs
ATLAS the institute’s controllers and RTUs
Atlas Max®Atlas Max-RTL®piko Atlas-RTLATLAS XP2
The institute’s own hardware platform: remote terminal units, controllers and gateways for power and industry. The line dates from 1963 — from the first RTU for Belgrade’s substations to Atlas Max-RTL on Real-Time Linux.
- 1963the first Atlas RTU — Belgrade substations
- 4SCADA centers connected at once
- −40…+60 °Coperating range of Atlas Max-RTL Hydra-4S
How it works · ATLAS
Module by module — for the site.
-
The CPU and the I/O modules are assembled for the site: digital and analog inputs, outputs, measuring transducers. DIN-rail mounting.
-
States, measurements and events with time stamps; sequence-of-events recording (SOE).
-
IEC 61850 client and server, IEC 60870-5-101/102/103/104, Modbus, DNP3, HART, BACnet, DLMS. Atlas also works as a gateway between them.
-
Ethernet, 4 × RS-232/485, 4G/3G/2G; four SCADA centers at once and channel redundancy.
-
PTP, NTP, IRIG-B synchronization; protection against DDoS, SSH and HTTP attacks; programming in function blocks.
System components
- Atlas Max®
A multifunction process computer — the base of the institute’s RTUs and PLCs.
- Atlas Max-RTL®
The successor of Atlas Max on Real-Time Linux; type Hydra-4S — ARM Cortex-A8, DIN rail.
- piko Atlas-RTL
A miniature modular RTU.
- ATLAS XP2
A single-rack multifunction process computer.
- Atlas Time Server
An accurate time source for the site.
- ARES
Recording of the power exchange between transmission and distribution networks.
- Atlas-BPC
Turbine speed monitoring and overspeed protection modules.
- I/O modules
BI16, BIS32, BOF32, KID16, KOA01, KVA8 and others; measuring transducers.
Protocols and standards
- IEC 61850
- IEC 60870-5-101/102/103/104
- Modbus
- DNP3
- HART
- BACnet
- DLMS
- PTP · NTP · IRIG-B
- Real-Time Linux
- DIN rail
Where it is used
- Substations and gridsTelecontrol and local control; links to several centers.
- Power plantsDCS and turbine governor controllers.
- IndustryControl and instrumentation of process plants.
- Water supplyRTUs of pumping stations and reservoirs.
Institut Mihajlo Pupin
The institute’s experience
- 2021Serbia, network operatorUpgrade of the local and remote control system on Atlas-Max-RTL
- 2019An oil pumpProduction and delivery of the control system and instrumentation
- 2017Belgrade water supplyRTUs
- 2008Vojvodina11 Atlas-MAX/RTL RTUs for distribution centers
- 1963BelgradeTelecontrol of the city utility’s substations — the first Atlas RTU
Solution selection
Inquiry: ATLAS
Describe the site and the task. Trinone Group selects a solution on the institute’s systems together with the group members’ equipment and prepares the proposal and the documentation.
- The site and the task
- System and equipment scope
- Proposal and documentation
QuestionnaireFill in onlineFill in by hand
The institute’s documents